Case Study

Molestiae non recusandae itaque earum rerum alias earic tenetur a sapiente.
Team Members

“From Sarawak to ASEAN: CEEC’s Energy Storage Redefines Regional Power Landscape”

Operational Impact‌

    “The success of Sajingan Katibas ESS marks CEEC’s technological solutions gaining recognition in ASEAN’s high – end market, providing Chinese wisdom for regional energy transition.” This project not only accelerates Sarawak’s green energy progress but also lays a solid foundation for CEEC’s expansion into Southeast Asian energy storage markets. Looking ahead, CEEC will deepen cooperation with SEB, TNB, and other enterprises to promote the widespread adoption of “storage +” models across ASEAN.

  1. Energy Transition Impact
    • Replaced 150MW coal – fired capacity, reducing annual CO₂ emissions by 102,000 tons
    • Improved grid peaking capacity by 35%, maintaining grid frequency at 50±0.1Hz
  2. Economic Benefits
    • Annual revenue increase of ~RM25 million through electricity spot market arbitrage
    • System reserve capacity reduction saving RM70 million in investment costs
  3. Industry Influence
    • First ASEAN energy storage project certified by EDIA
    • Increased Sarawak’s renewable energy share from 32% to 38%
  4. Social Value
    • Created 300 local jobs and trained 120 new energy professionals
    • Recognized as a key demonstration project in Malaysia’s 11th Five – Year Plan

Date

2024

Client

Sarawak

Category

Industrial &Commercial ESsProjects

Location

Malaysia

Share This Project :

Project Context

   In the global wave of energy transition, Southeast Asia is accelerating its shift from traditional fossil fuels to clean energy.

Engineering Solution

 

  1. Core ESS Technology
    • Deployed 60MW/82MWh LFP battery system supporting 1.37 – hour full – power discharge
    • AI – driven Energy Management System (EMS) enabling millisecond – level dynamic response
    • IP67 protection rating for tropical high – humidity environments
  2. Hybrid Energy Architecture
    • Integrated biomass power generation with battery storage to create a “biomass + storage” hybrid system
    • Reserved interfaces for future integration with Batang Ai 50MW floating solar farm
  3. Smart O&M System
    • Remote monitoring platform for real – time equipment health diagnosis
    • Digital twin technology optimizing charge/discharge strategies to extend battery life by 20%

 

Share This Project :

Free Consultation If You Want Build New Project With Us

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo dolore magna

Get a fast response from our expert

Let's have a chat