Case Study

Molestiae non recusandae itaque earum rerum alias earic tenetur a sapiente.
Team Members

CEEC’s “Neutron Star Explorer” Energy Storage System Deployed in Czech Industrial Enclave

Operational Impact‌

  • Cost Efficiency: Total energy costs reduced by 37%, with a 4.2-year ROI;
  • Carbon Neutrality: Cut CO₂ emissions by 286 tons/year (equal to 15,000 trees planted) by slashing diesel generator use by 1,200 hours;
  • Production Precision: Voltage fluctuations improved from ±8% to ±1.5%, boosting filling accuracy to 99.2%;
  • Market Advantage: Earned EU Silver Green Factory Certification, with products labeled “100% Renewably Powered,” increasing export competitiveness by 22%.

Date

August, 2022

Client

Air mist plant

Category

Solar

Location

Czech Republic

Share This Project :

Project Context

   The factory faces dual challenges

Engineering Solution

  Achieves “self-consumption + storage + peak shaving” revenue model, boosting PV self-use to 99.2%

Share This Project :

Free Consultation If You Want Build New Project With Us

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo dolore magna

Get a fast response from our expert

Let's have a chat